|
|
|
|
|
While working on the Tear Drop got this on camera |
|
|
|
|
|
|
|
|
12 Volt switch panel need to make labels still looking for the anchor |
|
|
|
|
|
|
|
|
Testing the battery. It works |
|
|
|
|
|
|
|
|
Inside skins with braceing |
|
|
|
|
|
|
|
|
Putting on fenders, to get the T nuts mounted |
|
|
|
|
|
|
|
|
Another view of the fender |
|
|
|
|
|
|
|
|
|
Getting ready to install the spars braceing the sides |
|
|
|
|
|
|
|
|
|
|
Another view of the spars |
|
|
|
|
|
|
|
|
Flush mount Reading Lights |
|
|
|
|
|
|
|
|
|
Outside skin being glued on |
|
|
|
|
|
|
|
|
Another view of the Outside Skin |
|
|
|
|
|
|
|
|
3/4 x 1" blocks used to glue to brace the inside skin |
|
|
|
|
|
|
|
|
Outside skins being clamp during glueing |
|
|
|
|
|
|
|
|
Door skins with epoxy coating |
|
|
|
|
|
|
|
|
Outside skins with epoxy coating |
|
|
|
|
|
|
|
|
Another view of the outsides |
|
|
|
|
|
|
|
|
110 v install next to the 12v switch panel |
|
|
|
|
|
|
|
|
110v install inside on the back buck head panel |
|
|
|
|
|
|
|
Framing out the air vent opening. |
|
|
|
|
|
|
|
|
|
|
Using tie downs to hole the roof on while gule is setting |
|
|
|
|
|
|
|
|
Back view of clams and tie downs |
|
|
|
|
|
|
|
|
|
Drilling the holes on the edge trim |
|
|
|
|
|
|
|
|
Drilling holes in the Door Trim |
|
|
|
|
|
|
|
|
1x2 by 1x4 angle used to trim door |
|
|
|
|
|
|
|
|
Screwing the door trim using clamps |
|
|
|
|
|
|
|
|
Another view of the clamping the door trim in place |
|
|
|
|
|
|
|
|
|
Screwing on the Side Trim |
|
|
|
|
|
|
|
|
Roof and Side tirm completed |
|
|
|
|
|
|